A little house status update of where things are at:
- Plans are currently in Council for full development approval. Expecting this to be complete possibly early November but I'm not really sure. Fingers crossed that it goes through smoothly and they don't have any issues with my plan and the position it sits on my land.
- Currently trying to finalise my electrical layout. This is hard. Hows a girl to know where to put every single power point, light and switch for a house thats not even built. I'm just trying to figure out where everything will go so I can make sure they are all in the right spots and I have enough for all appliances that require electricity. Cant go too crazy as the $$$ soon adds up with extra power points and lights.
- Booked my final selections appointments for early November. That's where I'll lock in all my bathroom tiles, kitchen colours, wardrobes, wall colour and a tonne of other stuff. Thinking of heading down to the showrooms again this weekend to have a look at everything and try and lock a few things in.
Also thought I'd add a pic of my front elevation/facade. It gives you a rough idea of what the front of the house will look like.
The house is only 11.5metres wide at the front, so all you see is the garage roller door, front door and bedroom window. I'm not having any render so the whole front will just be my lovely Oyster grey brick.
The house is only 11.5metres wide at the front, so all you see is the garage roller door, front door and bedroom window. I'm not having any render so the whole front will just be my lovely Oyster grey brick.
No comments:
Post a Comment
Thank you soo much for taking time to comment! I read every comment, and appreciate it very much! Don’t forget to subscribe to MissLibe to get future post delivered to your feed reader or email xx