The electrical wiring went in next, followed by the insulation. For those who like the technical details I have R4 in the roof, R2.5 in the external walls.
The electrical wiring went in next, followed by the insulation. For those who like the technical details I have R4 in the roof, R2.5 in the external walls.
I also choose to add internal wall insulation. This all helped my house pass the 6 star energy rating which is required when building a new home.
Only a few days passed and all my internal walls and ceiling were up. This was a bit of a wow moment as it finally started looking like a home. I could walk in all my rooms and image the furniture placement. It was also great to be able to see how the light flowed in through the different windows, depending on which direction they face.
This was kind of a sad moment too as I knew it wouldn't be long before all the doors went on, which means the house is at 'lock up' and I can no longer walk through unless there is tradies working there, as I don't have a key, but this also means one step closer to completion.
Miss Libe that is looking fantastic!! Lock up is exciting and hopefully is getting close to the end.
ReplyDeleteKeep the updates coming!
Oh and I love the technical details too :)
Cheers,
Nat
xx
http://landhousereno.blogspot.com.au/
Thanks Nat! lock up is very exciting, I love every stage though. Its been so wonderful watching something on paper come to life x
Delete